Today

3 weeks ago

Donald and Melanija Trump The other day Melanija Trump and her husband Donald visited a lunch in honor of Thanksgiving Day in Maher - Lago. The first lady of the USA looked incredibly in a black lacy...

3 weeks ago

In Krasnoyarsk will open a skating rink with color ice. Its total area will be about 17.5 thousand sq.m. It will be possible to go ice skating in the pleasure daily from 11 to 23 o'clock. Besides, it...

3 weeks ago

The Russian Foreign Minister Sergey Lavrov holds a meeting with the Portuguese colleague to Augusht Santushem Silvoy in Lisbon. The meeting takes place in the closed format. The correspondent of TASS...

3 weeks ago

Relatives of 55 residents of the Netherlands which died as a result of the crash of the liner of "Malaysian airlines" in the east of the Ukrainian state within last year submitted to the European Cou...

3 weeks ago

Two VS ships of Russia are found on November 24 in sea border of Latvia. Such statement was made by the National Armed Forces (NAF) of the country on the Twitter. LV ekskl. ekonom. zona 11 j.j. no ter...

Date: 2 months ago   Category: Society

In three hours military railroad workers of the Southern Military District built the wooden bridge in near Volgograd


In three hours military railroad workers of the Southern Military District built the wooden bridge in near Volgograd
Within total check of the Southern Military District (SMD) for the summer period of training military railroad workers of the connection deployed in the Volgograd region provided a crossing of military equipment of motor-shooters of the Southern Military District connection through the bed of the river more than 30 m wide on the Prudboy ground. For shift of troops through a water barrier the wooden bridge with a loading capacity over 50 tons was built. Operational characteristics of a temporary crossing allow to carry out transfer about 500 units of military equipment. After transition of motor-shooters to other river bank Karpovka the wooden design was conditionally mined for the purpose of failure of advance of troops of the conditional opponent on this site of the area. The wooden crossing was built by military experts within three hours with attraction of the floating car for installation of piles, the universal svayeboyny unit and the collapsible crane. In a structure of the bridge more than 4 tons of wooden logs and a bar were used. Improvised forest product if necessary can be involved in combat conditions. The construction of a similar design is applied during conducting combat operations that in need of the shortest time to carry out a crossing of troops and military equipment through a water barrier or a deep ravine.
of mil.ru Maxim Novikov Today, 12:23 0

URL:

Photos of day